Challenge:
The installation site was extremely confined, with only one entry point and less than a foot of clearance around the perimeter, making access and maneuverability highly restricted.
Achievement:
Despite the tight space and logistical constraints, our team successfully supplied and installed the 30mil XR5 geomembrane panels and 44" high-containment system—all in a single day.
Product Used:
Location: Los Angeles, California
Project Type: Product Supply & Installation
Product Used: 30mil XR5 Prefabricated Geomembrane Panels
Challenge
A dosing system at a sewage transfer/pumping station in Los Angeles California required a small secondary containment.
The Titan Solution
We supplied and installed 30mil XR5 geomembrane prefabricated panels as well as a 44" high-containment system.
Achievement
Our team started and finished the job in one day, despite working in a limited location surrounded by a fence with only one entry point and barely a foot of space around the perimeter of the installation area.