Hydroelectric Transformer Oil Containment Pit Lining, Geomembrane

Hydro-Station-banner-1-1024x320

Industry

Oil & Gas

Challenge:

Titan was selected to line two large oil containment pits at Manitoba Hydro’s remote Manigotagan Corner Station, requiring a chemically resistant solution to protect the environment from potential transformer oil leaks.

Achievement:

Leveraging our extensive experience in Northern Manitoba, Titan successfully supplied and installed the geomembrane liner to the client’s satisfaction, reinforcing our trusted reputation with Manitoba Hydro.

Product Used:

Location: Manigotagan, Manitoba

Project Type: Product Supply & Installation

Product Used: Chemically resistant geomembrane

Challenge

2 oil containment pits required lining at Manitoba Hydro’s Manigotagan Corner Station.

The Titan SolutionKIMG1873-1800-768x1024

Titan was hired to supply and install a chemically resistant geomembrane liner in 2 oil containment pits at Manitoba Hydro’s Manigotagan Corner Station. Built around hydro-electric transformers, the oil containment pits measured 12m x 15.24m.  They work to protect the ground from oil that may spill from the transformers during operation.

 

Achievement

We were chosen for our proven reputation and track record working in Northern Manitoba on numerous Manitoba Hydro projects.

 