Challenge:
The outfall of a Highway 401 drainage system in Kingston, Ontario was prone to overflow during heavy rainfall, causing water and debris to spill onto a CN railway line, with previous rock-based solutions proving ineffective and alternative products requiring costly rail shutdowns.
Achievement:
Concrete Canvas was installed in just 5 hours with minimal disruption, successfully reinforcing the outfall banks and redirecting water flow, resulting in a durable, low-impact solution that met both MTO and CN Rail requirements.
Product Used:
Concrete Canvas®
Location: Kingston, Ontario
Project Type: Product Supply & Installation
Product Used: Concrete Canvas® CC8 Bulk
Challenge
The outfall of a Highway 401 drainage system in Kingston, Ontario was a persistent maintenance issue, as water and debris frequently overflowed the drainage banks during heavy rainfall, spilling onto a CN railway line. Previous attempts to control the flow using shattered rock were ineffective, and alternative solutions required extended railway shutdowns, risking costly delays and disruptions.
The Titan Solution
In November 2017, Pomerleau installed 170 sq. m of Concrete Canvas (CC8 Bulk) as an outfall lining for the Ministry of Transportation of Ontario. Site preparation included compacting the ground and placing Jersey Barriers to redirect water flow. CC was rolled out using an excavator, seated into the embankment, laid transversely across the drainage course, and sealed with dual beads of sealant. Hydration was completed using runoff water and a water tank, with the entire installation completed in overcast conditions at 6°C.
Concrete Canvas® (CC) is a Geosynthetic Cementitious Composite Mat (GCCM), a factory-produced material combining cement within geosynthetic layers that hardens when hydrated for erosion control and weed suppression.
Achievement
The installation was completed in just 5 hours by a crew of five workers and one excavator operator, with minimal disruption to railway operations. Concrete Canvas provided a fast, effective, and low-impact solution that successfully reinforced the outfall banks and redirected water flow, meeting both MTO and CN Rail requirements.