Challenge:
Provide and install a geodesic dome for Lafarge Holcim
Achievement:
We were selected for our proven experience with geodesic aluminum dome construction, our ability to provide a well-staffed crew, and our commitment to high safety and QAQC standards.
Product Used:
Geodesic Dome
Location: Exshaw, Alberta
Project Type: Product Supply & Installation
Product Used: One aluminum geodesic dome
Challenge
Provide and install a geodesic dome for Lafarge Holcim
Titan Solution

This project involved erecting an impressive aluminum geodesic dome as part of a dry Lime storage facility. Measuring 46 meters (150 ft) high and spanning 111 meters (364 ft), about the length of a football field, this dome is considered one of the largest in Canada. Resting on a concrete footing, it provides weather-proof storage for dry lime used in cement manufacturing.
Titan was re¬sponsible to build the entire dome which included assembling and utilizing an impressive 91 meter (300 ft) centrally located tower to facilitate lifting and construction in sections.
Product Supply: We offer a range of innovative, low-impact and cost-effective products designed to protect soil, water and air, and preserve natural resources.
Achievement
We were selected for a variety of reasons including our proven resume with construction of geodesic aluminum domes, as well as our ability to provide a well-staffed working crew to meet the project requirements and comply with high safety and QAQC standards.