title: Fire Water Pond Lining - LLDPE Geomembrane
description: CentrePort Canada required an emergency fire pond to provide reliable, on-site water access for firefighting at North America’s largest inland port.
---

![TITAN CASE STUDY (1)](https://casestudies.titanenviro.com/hs-fs/hubfs/TITAN%20CASE%20STUDY%20(1).png?width=400&height=75&name=TITAN%20CASE%20STUDY%20(1).png)

# Fire Water Pond Lining - LLDPE Geomembrane

![Fire Water Pond Manitoba](https://casestudies.titanenviro.com/hs-fs/hubfs/Fire%20Water%20Pond%20Manitoba.jpg?width=2000&height=1500&name=Fire%20Water%20Pond%20Manitoba.jpg)

Industry

Civil Infrastructure

Challenge:

CentrePort Canada needed an on-site emergency fire pond to provide reliable water access for firefighting response.

Achievement:

Titan completed the fire pond installation in just one day, setting a new standard for speed and efficiency while exceeding expectations and meeting critical deadlines.

Product Used:

LLDPE Liner

[ titanenviro.com/fire-water-pond-winnipeg-center-port-2/ ](https://titanenviro.com/fire-water-pond-winnipeg-center-port-2/?hsLang=en)

#### Location:  Winnipeg, Manitoba (CentrePort Canada)

#### Project Type:  Product Supply & Installation

#### Product Used:  LLDPE Geomembrane

## Challenge

An emergency fire water pond was required for CentrePort Canada, the largest trimodal inland port and Foreign Trade Zone in North America located in Winnipeg. These fire ponds are required for water containment, providing fire fighting response teams with convenient water access to fill fire trucks..

 

## Titan Solution

 

Titan supplied and installed a total of 24,983 sq. ft (2,321 m²) of 60mil LLDPE Geomembrane. This material is the ideal liner for a leakproof fire pond because of its high-quality, exceptional strength, durability and long lifespan .

 

> [ LLDPE geomembrane](https://titanenviro.com/products/environmental-containment/geomembranes/lldpe-geomembrane/?hsLang=en) is a durable, flexible liner made from virgin polyethylene resins, designed for long-term performance with excellent UV and low-temperature resistance.

## Achievement

Titan set a new benchmark for speed and accuracy in pond construction by completing the installation process in just one day, demonstrating our extraordinary efficiency. In addition to demonstrating Titan's unmatched experience, this accelerated schedule made sure the pond was operating in record time, meeting deadlines, and outperforming expectations with incredible efficiency.

## Have a similar project in mind?

[![Let's Talk](https://no-cache.hubspot.com/cta/default/6907006/interactive-189156965415.png) ](https://casestudies.titanenviro.com/hs/cta/wi/redirect?encryptedPayload=AVxigLJ1KCFTuUVUkLAMRV%2B9ybzVeqMung4KgwtRGUFv01C6Y0qjxT%2BVAM%2BD7bZ7e7o0aZt3jW7SC74LIggchCstjNtNs1esoJ3sISBCmbrZn79Nr4WyGZR7ytcneOv6cbe1MKRClzzOiSg7q8LyqrLm2LYR1NR%2BQ6CiEosp1gObySOvIWf8jsW8&webInteractiveContentId=189156965415&portalId=6907006&hsLang=en)

## Related case studies

[![](https://casestudies.titanenviro.com/hs-fs/hubfs/OPP10261%20Stoney%20Wall%20ON%20(24)%20(1).jpg?width=4000&height=4000&name=OPP10261%20Stoney%20Wall%20ON%20(24)%20(1).jpg)

Civil Infrastructure

### Indigenous House Auditorium Wall: Titan Earth Wall® - Stoney

](https://casestudies.titanenviro.com/cs/indigenous-house-auditorium-wall-titan-earth-wall-stoney?hsLang=en) [![](https://casestudies.titanenviro.com/hs-fs/hubfs/Vapor%20Barrier%20System_1.jpg?width=2000&height=2000&name=Vapor%20Barrier%20System_1.jpg)

Civil Infrastructure

### Advanced Vapor Barrier System for Chemically Contaminated Building Footprint

](https://casestudies.titanenviro.com/cs/vapor-barrier-system?hsLang=en) [![](https://casestudies.titanenviro.com/hs-fs/hubfs/StormSmart%20Tank_Brantford_ON_July2025%20(1)-1.jpg?width=5972&height=5972&name=StormSmart%20Tank_Brantford_ON_July2025%20(1)-1.jpg)

Civil Infrastructure

### Titan StormSmart™ Tank

](https://casestudies.titanenviro.com/cs/titan-stormsmart-tank?hsLang=en)