Landfill Pumping Station

Industry
Wastewater
Challenge:
To avoid premature replacement, the client sought a solution to protect landfill pumping station concrete from the corrosive effects of leachate gases used in off-site electricity generation.
Achievement:
Titan collaborated closely with the client to deliver a successful project, earning praise for both the solution and quality of work.
Product Used:
Concrete Protection Liner
Location: Waterloo, Ontario
Project Type: Product Supply & Installation
Product Used: Concrete Protection Liner
Challenge
Landfill pumping stations collect leachate emitted by the landfill. Here these gases are then extracted, and sent off site to generate electricity. Over time, the concrete will erode as a result of corrosiveness of the leachate gases flowing through, and would need to be completely replaced. The client needed a solution to prevent premature replacement.
Titan Solution
Titan supplied concrete protective liner to be installed in the pumping station facility. This solution works to extend the life of the concrete in the pumping station.
We pre-fabricated the liner panels and worked with the general contractor to install them into the formwork, walls, floors and ceilings. After they were installed, we came in and welded the joints. This was a superior solution than spray applied coating.
Concrete Protection Liner (CPL) is made of high-density polyethylene (HDPE), provides superior protection compared to other technologies.
Achievement
We worked extensively with the client, and completed the job successfully. The customer was very pleased with the solution and Titan's quality of work.