Challenge:

Titan was selected to supply and install a 40-mil polyurethane prefabricated geomembrane system for a fuel tank secondary containment area in Guam, requiring precision and durability in a remote, high-stakes environment.

Achievement:

Titan successfully delivered a high-quality installation that met all performance and safety standards, reinforcing its reputation as a trusted provider of turn-key geosynthetic solutions.

Product Used:

Location: Guam, United States

Project Type: Product Supply & Installation

Product Used: 40-mil Polyurethane Prefabricated Geomembrane

Challenge

A client in Guam needed a secondary containment solution for two large fuel storage tanks.


The Titan SolutionGuam_L228008 (1)

Titan, a leading provider of turn-key geosynthetic solutions, was chosen to provide a high-quality installation that met the client's specifications for materials and design.

The project involved the fabrication of geomembrane panels that were shipped to site and installed as part of a secondary containment lining system for large fuel storage tanks. This system act as a barrier to protect the surrounding soil from the risk of contamination with potential leaks.

A polyurethane geomembrane was used for this project as it is well-known for its versatility and fire-resistant properties, providing excellent resistance to corrosion caused by harsh chemicals. Titan’s experienced fabrication team used the latest seaming and welding technology to custom fabricate pie-shaped liner pieces to accommodate the eight sumps and tight pipe fitting around each fuel storage tank.

The robust system fabricated and installed by Titan included a 10 oz geotextile underlayment, followed by a 40-mil polyurethane prefabricated geomembrane liner, and was rounded out with a 10 oz geotextile overlay.

 
 

Achievement

Using the latest seaming and welding technology, our fabrication team custom fabricated pie-shaped liner pieces to accommodate the eight sumps and tight pipe fitting around each fuel storage tank. We delivered the product to site and our senior installation team efficiently installed the lining system on schedule and to customer satisfaction, completing the project within 18 days of the material arriving at site.