# Culvert Outfall

![Culvert-Outfall_SK_2024](https://casestudies.titanenviro.com/hs-fs/hubfs/Culvert-Outfall_SK_2024.jpeg?width=1210&height=1613&name=Culvert-Outfall_SK_2024.jpeg)

Industry

Civil Infrastructure

Challenge:

The rural municipality faced significant erosion issues at a culvert outfall during a new road construction project in Saskatchewan.

Achievement:

The team successfully installed 343 ft² of Concrete Canvas® CC8™ in just 4 hours wit

Product Used:

Concrete Canvas®

[ titanenviro.com/culvert-outfall_sk_2024/ ](https://titanenviro.com/culvert-outfall_sk_2024/?hsLang=en)

#### Location: Saskatchewan, Canada

#### Project Type: Product Supply & Installation

#### Product Used: Concrete Canvas® CC8™ Batch Rolls 

## Challenge

A rural municipality in Saskatchewan needed a solution to address erosion at a culvert outfall as part of a new road construction project.

## The Titan Solution

Titan supplied seven batch rolls of Concrete Canvas® CC8™ and transported them directly to the site. Based on site conditions, CC was selected as the ideal material. Titan also provided on-site installation assistance to ensure proper deployment.

> [Concrete Canvas® (CC)](https://titanenviro.com/products/erosion-control/concrete-canvas-geosynthetic-cementitious-composite-mat/?hsLang=en) is a Geosynthetic Cementitious Composite Mat (GCCM), a factory-produced material combining cement within geosynthetic layers that hardens when hydrated for erosion control and weed suppression.

## Achievement

A four-person crew successfully installed 343 ft² of CC8™ in just four hours, completing the project in one day and demonstrating the product’s effectiveness in erosion control and slope protection.

## Have a similar project in mind?

[![Let's Talk](https://no-cache.hubspot.com/cta/default/6907006/interactive-189156965415.png) ](https://casestudies.titanenviro.com/hs/cta/wi/redirect?encryptedPayload=AVxigLJUbVzG63fnZyBuOcXS0hBnQEN9qLbUL5TD8X89OIUMmP%2Fgps6HZBcyyqXCozRD08lhYb1xHTyrgIMWGzI8jVCPiyVPW6I0YOByOvCf11AB1Zrxwpsl%2BWDd4YUxDnof5obj4wryK%2FgTamHAPjV49QI3KHxFgK5CXXzLK63kT0uG8ZjCeLnR&webInteractiveContentId=189156965415&portalId=6907006&hsLang=en)

## Related case studies

[![](https://casestudies.titanenviro.com/hs-fs/hubfs/OPP10261%20Stoney%20Wall%20ON%20(24)%20(1).jpg?width=4000&height=4000&name=OPP10261%20Stoney%20Wall%20ON%20(24)%20(1).jpg)

Civil Infrastructure

### Indigenous House Auditorium Wall: Titan Earth Wall® - Stoney

](https://casestudies.titanenviro.com/cs/indigenous-house-auditorium-wall-titan-earth-wall-stoney?hsLang=en) [![](https://casestudies.titanenviro.com/hs-fs/hubfs/Vapor%20Barrier%20System_1.jpg?width=2000&height=2000&name=Vapor%20Barrier%20System_1.jpg)

Civil Infrastructure

### Advanced Vapor Barrier System for Chemically Contaminated Building Footprint

](https://casestudies.titanenviro.com/cs/vapor-barrier-system?hsLang=en) [![](https://casestudies.titanenviro.com/hs-fs/hubfs/StormSmart%20Tank_Brantford_ON_July2025%20(1)-1.jpg?width=5972&height=5972&name=StormSmart%20Tank_Brantford_ON_July2025%20(1)-1.jpg)

Civil Infrastructure

### Titan StormSmart™ Tank

](https://casestudies.titanenviro.com/cs/titan-stormsmart-tank?hsLang=en)