Rail Intermodal Facility

Milliken-CC-Slope-Protection-Rossville-TN

Industry

Industrial

Challenge:

A steep slope at a rail intermodal facility in Rossville, Tennessee had deteriorated despite being previously lined with riprap, making maintenance difficult and failing to meet regulatory standards.

Achievement:

2,787 m² of CC5™ were installed longitudinal layers at a rate of 557 m² per day, successfully stabilizing the slope and earning client approval for future use of Concrete Canvas®

Product Used:

Concrete Canvas®

Location: Rossville, Tennessee,  USA

Project Type: Product Supply & Installation

Product Used: Concrete Canvas® CC5 Bulk Rolls

Challenge

At a rail intermodal facility in Rossville, Tennessee, a steep slope previously protected with riprap had deteriorated over time. The slope became difficult to maintain and no longer met regulatory standards, prompting the client to seek a more effective, low-maintenance solution that could prevent surface saturation and ensure long-term stability.

The Titan Solution

2,787 m² of CC5™ Geosynthetic Cementitious Composite Mat (GCCM) were installe and branded as Concrete Cloth™ in the U.S. The material was delivered in bulk rolls and laid longitudinally from crest to toe. Layers were overlapped by 100 mm, secured with percussion earth anchors, and the edges were fixed in anchor trenches before backfilling.

Concrete Canvas® (CC) is a Geosynthetic Cementitious Composite Mat (GCCM), a factory-produced material combining cement within geosynthetic layers that hardens when hydrated for erosion control and weed suppression.

Achievement

The installation was completed at a rate of approximately 557 m² per day, providing a durable, low-maintenance slope protection solution. The client was highly satisfied with the outcome and recognized Concrete Canvas® as a viable option for future projects.