Pyramat-Mine Closure

Industry

Mining

Challenge:

This closure dam project near Fort McMurray, AB, needed slope erosion control solutions that were cost effective and long lasting.

Achievement:

With nearly 20 years of industry experience, Titan delivered a durable, cost-effective solution using fewer materials, while a skilled 13-man crew safely completed the project ahead of schedule and to high quality standards.

Product Used:

PYRAMAT®

Location: Fort McMurray, Alberta

Project Type: Product Supply & Installation

Product Used: PYRAMAT® 75 HPTRM

Challenge

This closure dam project near Fort McMurray, AB, needed slope erosion control solutions that were cost effective and long lasting.


Titan Solution

Pyramat - Mine Closure 2The closure dam project in Aurora, North Mine, Alberta, was initially designed to be completed with 700mm of Rip-Rap Rock and geotextile for slope erosion control measures. After consulting with the client, Titan proposed a longer-lasting and more cost-effective solution, which included lining the dam slopes with PYRAMAT®, a high-performance turf reinforcement mat (HPTRM) made of woven polypropylene geotextile. An impressive 484,376 SF (45,000 m2) of material was supplied and installed.

PYRAMAT®75 is a high-performance turf reinforcement mat (HPTRM) made of woven polypropylene geotextile. 

Achievement

With nearly two decades in the geosynthetic industry, Titan was able to provide a long-lasting and economical solution. Less material (rolls) than originally budgeted for was used to complete the project while maintaining our Titan quality control standards. The thirteen-man installation team braved weather elements, remained safe, and used their experience and expertise to complete the job in record time.