Mine Vent Wall (Canada)
.jpeg?width=1392&height=1046&name=CC-Mine-Vent-Wall-Canada-Creighton-Mine-Vale-Canada-Ltd%20(1).jpeg)
Industry
Mining
Challenge:
Constructing vent closures in remote, hard-to-access areas of an underground mine posed logistical difficulties and high costs using traditional methods.
Achievement:
Concrete Canvas® enabled fast, cost-effective installation of vent walls with minimal crews, transforming ventilation closure practices at Creighton Mine.
Product Used:
Concrete Canvas®
Location: Creighton Mine, Ontario
Project Type: Product Supply & Installation
Product Used: Concrete Canvas® CC8 Batched Rolls
Challenge
Constructing vent closures in remote, hard-to-access areas of Creighton Mine was logistically complex and costly, traditionally requiring multiple crews and specialized equipment.
The Titan Solution
Concrete Canvas® GCCM (Geosynthetic Cementitious Composite Mat) offered a lightweight, pre-batched, and easy-to-install alternative that could be manually transported and secured with minimal labor, even in confined underground spaces.
Concrete Canvas® (CC) is a Geosynthetic Cementitious Composite Mat (GCCM), a factory-produced material combining cement within geosynthetic layers that hardens when hydrated for erosion control and weed suppression.
Achievement
The use of CC revolutionized vent wall construction at the mine—reducing costs, simplifying logistics, and improving safety, especially in areas still subject to blasting.