Cofferdam Solution - Great Falls, MB

Industry
Water Management
Challenge:
The project’s main challenge was controlling river water to safely blast bedrock on the riverbank for outfall pipe installation, requiring a fast, effective temporary water barrier.
Achievement:
We offered a cost-effective solution and worked with our supplier to provide the client with installation site assistance.
Product Used:
Cofferdam
Location: Great Falls, Manitoba (Winnipeg River)
Project Type: Supply and Installation
Product Used: 13 Cofferdam Tubes
Challenge
Hold back river water during local blasting operations.
Titan Solution
Titan supplied 13 cofferdam tubes of varying lengths for a water treatment plant outfall pipe installation on the bank of the Winnipeg River. To complete the installation, the contractor needed to blast through local bedrock along the riverbank, which required holding back the surrounding river water. They turned to Titan for a solution, and we recommended cofferdams—tube-like structures made from industrial-grade PVC. Easily deployed and inflated with river water, the cofferdams quickly formed a temporary dike, effectively keeping water away from the blast zone and enabling safe, dry working conditions.
Achievement
We offered a cost-effective solution and collaborated with our supplier to provide the client with on-site installation assistance.