Skip to content

CN Rail Upgrade in Peace River - WickGrid™ Case Study

Supporting Railway Subgrade Stability With Wickgrid™

Industry

Civil Infrastructure

Challenge

Moisture penetration into the railway subgrade was causing soil softening and creating potential track stability concerns. CN Rail needed a geogrid solution to help manage moisture, provide filtration and stabilize the affected areas.

Results

WickGrid™ was selected to address the moisture-related subgrade conditions. Compared with areas requiring annual upgrades, the solution is expected to extend the maintenance interval to approximately 5–10 years, depending on moisture conditions. Titan also met the project's tight material delivery timeline.

Key Product

WickGrid™

Location: Peace River, Alberta

Project Type: Supply Only

Product Used: WickGrid™ Geogrid Composite

Challenge

CN Rail_WickGrid_Alberta_Oct2026_Rail MovedAlong sections of railway in the Peace River area, moisture was penetrating the subgrade and softening the soil beneath the track. If left unaddressed, these weakened areas could contribute to track distortion and impact long-term track stability.

CN Rail planned upgrades to address these moisture-related conditions and required a geogrid solution that could provide filtration and stabilization. Maintaining the integrity of the railway was particularly important given that the line travels through multiple communities. The material also needed to be supplied within a short delivery window so the planned upgrades could proceed as scheduled.

Titan Solutions

Prep for Install

CN Rail had previously used WickGrid™ on other railway upgrades and contacted Titan Environmental to supply the same product for additional work. Titan discussed several geogrid options, given the need for filtration and moisture management, WickGrid™ was identified as the best fit.

CN Rail had already experienced the product's capabilities on previous projects and was confident in its suitability for these additional upgrades.

WickGrid™ was selected for its wicking and filtration properties, which help manage moisture and support stability in the rail subgrade. Titan coordinated the required material volume and delivery logistics to meet CN Rail's requested timeline. Titan's involvement focused on product supply and delivery rather than initial project planning.

The Results

Post Install CN RailTitan supplied the requested WickGrid™ within the required timeframe, helping CN Rail proceed with its planned railway upgrades. Titan was able to provide the appropriate material volume and coordinate delivery without significant obstacles. CN Rail was pleased with Titan's quick response and organization of the material for the project.

Beyond meeting the immediate project requirements, WickGrid™ offers the potential for longer-term performance in areas affected by moisture-related subgrade issues.

According to the project information provided, similar wet-subgrade areas without geogrid reinforcement may require more frequent upgrades. By helping manage moisture and maintain subgrade stability, WickGrid™ can reduce the frequency of repeat interventions while supporting more stable and reliable railway infrastructure.

CN Rail was satisfied with the project support and expects to contact Titan again as additional areas require upgrades.

Ready to get started?