Bund Lining

Industry
Industrial
Challenge:
A hydroelectric site in Iowa required a fast, fire-resistant, and low-maintenance erosion control solution for berms surrounding nine fuel storage tanks.
Achievement:
Titan supplied and installed 68,864 SF of Concrete Canvas® (CC5), completing the project safely and efficiently within just three weeks.
Product Used:
Concrete Canvas®
Location: Dubuque,Iowa
Project Type: Product Supply & Installation
Product Used: Concrete Canvas® (CC5)
Challenge
A hydroelectric site required a fast, fire-resistant, and low-maintenance erosion control solution to protect berms surrounding nine fuel storage tanks.
The Titan Solution
Titan supplied 32 rolls of Concrete Canvas® (CC5), covering 68,864 ft² (6,397 m²), which met all project requirements including erosion protection, fire safety, and weed suppression. The installation was completed efficiently by local contractors within a tight three-week timeline, ensuring site safety and long-term durability.
Concrete Canvas® (CC) is a Geosynthetic Cementitious Composite Mat (GCCM), a factory-produced material combining cement within geosynthetic layers that hardens when hydrated for erosion control and weed suppression.
Achievement
Titan delivered a safe, cost-effective, and timely solution that met all performance criteria, completing the project within three weeks despite a compressed schedule.