Skip to content

Bund Lining 

IMG_79621

Industry

Industrial

Challenge:

A hydroelectric site in Iowa required a fast, fire-resistant, and low-maintenance erosion control solution for berms surrounding nine fuel storage tanks.

Achievement:

Titan supplied and installed 68,864 SF of Concrete Canvas® (CC5), completing the project safely and efficiently within just three weeks.

Product Used:

Concrete Canvas®

Location: Dubuque,Iowa

Project Type: Product Supply & Installation

Product Used: Concrete Canvas® (CC5)

Challenge

A hydroelectric site required a fast, fire-resistant, and low-maintenance erosion control solution to protect berms surrounding nine fuel storage tanks.


The Titan Solution

Titan supplied 32 rolls of Concrete Canvas® (CC5), covering 68,864 ft² (6,397 m²), which met all project requirements including erosion protection, fire safety, and weed suppression. The installation was completed efficiently by local contractors within a tight three-week timeline, ensuring site safety and long-term durability.

Concrete Canvas® (CC) is a Geosynthetic Cementitious Composite Mat (GCCM), a factory-produced material combining cement within geosynthetic layers that hardens when hydrated for erosion control and weed suppression.

Achievement

Titan delivered a safe, cost-effective, and timely solution that met all performance criteria, completing the project within three weeks despite a compressed schedule.

 

Have a similar project in mind?