# BGM - Tailings Pond

![BGM - Tailings Pond (1)](https://casestudies.titanenviro.com/hs-fs/hubfs/BGM%20-%20Tailings%20Pond%20(1).jpg?width=1500&height=844&name=BGM%20-%20Tailings%20Pond%20(1).jpg)

Industry

Mining

Challenge:

To support continued mining operations, the Stage 2 raise of the TMF Tailings Dam extended capacity through upstream, downstream, and spillway work, integrating a new geomembrane with the existing liner while addressing steep slope safety and environmental protection.

Achievement:

Completed on schedule, the project extended the dam’s tailings capacity to 2026 while safeguarding the environment, with Titan’s collaboration, quality focus, and technical expertise cementing its leadership in geomembrane and infrastructure solutions.

Product Used:

Bituminous Geomembrane (BGM)

[ titanenviro.com/tailings-pond_bgm_ontario/ ](https://titanenviro.com/tailings-pond_bgm_ontario/?hsLang=en)

#### Location: Northeast Ontario

#### Project Type: Product Supply & Installation

#### Product Used: Coletanche® ES2 BGM

## Challenge

With Stage 1 of the TMF Tailings Dam nearing capacity, a vertical extension was essential to sustain ongoing and future mining operations. The Stage 2 dam raise involved three work fronts—upstream, downstream, and spillway—and required integrating a new geomembrane with the Stage 1 liner to maintain a seamless containment system. Key challenges included ensuring worker safety on steep slopes near hazardous tailings and protecting the environment from potential leakage.

## Titan Solution

Titan supplied and installed 35 rolls of Coletanche® ES2 BGM and 39 rolls of TE-10 GTX to complete the project. These materials were used to tie into the existing Stage 1 geomembrane while raising the dam. Titan's expertise ensured precise installations on all work fronts and effective safety protocols, equipping workers with fall arrest systems and life jackets to address the steep slopes.

> [Bituminous geomembrane](https://titanenviro.com/products/environmental-containment/geomembranes/bituminous-geomembrane-bgm-liner/?hsLang=en), known as BGM liner, is a specialty geomembrane with composite layers that make it stronger, more watertight, and more durable than resin-based geomembranes.

## Achievement

The project was completed on schedule, extending the dam’s capacity to manage tailings until 2026. This robust containment solution protects the surrounding environment while supporting ongoing mining operations. Titan’s collaborative efforts with contractors, commitment to quality, and technical expertise reinforced its reputation as a leader in geomembrane installations and infrastructure solutions.

![BGM - Tailings Pond (2)](https://casestudies.titanenviro.com/hs-fs/hubfs/BGM%20-%20Tailings%20Pond%20(2).jpg?width=1500&height=844&name=BGM%20-%20Tailings%20Pond%20(2).jpg)

 

## Have a similar project in mind?

[![Let's Talk](https://no-cache.hubspot.com/cta/default/6907006/interactive-189156965415.png) ](https://casestudies.titanenviro.com/hs/cta/wi/redirect?encryptedPayload=AVxigLK0iGseIFpe5ZQ2igdWUuqwZYzlojmm%2Bfj64rEFP3v%2F387KVff4W4O044xZpNKKOCtPbbTI4fxV9c6N3Jrlrg3yTZRlhl5mCntT8td32Zu5Yq9pqdGb5q2A%2BJ78zNpmXy4axFPCxescXo0fejdxrkYb8QVLa3bm60V1A0GJtDrMmspFTKTV&webInteractiveContentId=189156965415&portalId=6907006&hsLang=en)

## Related case studies

[![](https://casestudies.titanenviro.com/hs-fs/hubfs/Rib%20support%20-%20Installation.jpg?width=3648&height=3648&name=Rib%20support%20-%20Installation.jpg)

Mining

### Underground Mine Tunnel Roof and Rib Support

](https://casestudies.titanenviro.com/cs/underground-mine-tunnel-roof-and-rib-support?hsLang=en) [![](https://casestudies.titanenviro.com/hs-fs/hubfs/Armormax-Mining.jpg?width=1500&height=1500&name=Armormax-Mining.jpg)

Mining

### ARMORMAX® System for Stabilization of Mine Tailings Dam Slope

](https://casestudies.titanenviro.com/cs/armormax-tailingsdam?hsLang=en) [![](https://casestudies.titanenviro.com/hs-fs/hubfs/CC-Mine-Tunnel-lining-Titan.jpeg?width=4724&height=4724&name=CC-Mine-Tunnel-lining-Titan.jpeg)

Mining

### Mine Tunnel Lining

](https://casestudies.titanenviro.com/cs/mine-tunnel-lining?hsLang=en)